You are here: Home » News » Building Materials Information » Building Materials Knowledge » How to prevent the bottom of the building template from running?

How to prevent the bottom of the building template from running?

Views:785     Author:Site Editor     Publish Time: 2019-08-14      Origin:Site

How to prevent the bottom of the building template from running?

In the production of building templates, manufacturers need to make some details for each production process. During the installation of the building formwork, if the bottom of the building formwork is not properly operated, it is easy to cause running problems. Here is how to prevent the bottom of the building formwork from running.


Before the building formwork is installed, a thick sponge strip should be placed at the bottom of the building formwork support pad.


If the bottom is seriously uneven, it should be used along the inner edge of the building formwork: cement mortar, according to the given elevation line, accurate leveling (the flat layer should not extend into the wall), and the outer root of the outer wall of the outer wall should be provided with building formwork load-bearing S.


Divide by the elevation line and lay a flat circle on the leveling mortar to ensure accuracy. The elevation is accurate and there is no leakage.


The above is a small series of methods for you to prevent the bottom of the building template from running. I hope it will help you install it.Building template


How to prevent the bottom of the building template from running?

QUICK LINKS

PRODUCTS

NEWS

CONTACT US

Tel:+86-05398878525
E-mail:kefu@linyigate.cn
Add:Intersection of Mengshan Elevated Yihe Road, Linyi City Shandong Province
©Shandong Datu Network Information Technology Co., Ltd. All rights reserved. Technology by datutop.com

Online Message